Technical Development

Technical Development

 

1952.

JIAXING BATTERY FACTORY has been established in 1952

1958.

start producing zinc air battery, 45V, 90V

1961.

start producing lead acid battery (Independent R&D)

1963.

Export battery to Asia market through  Import and Export company

1971.

start producing R6C paper type zinc-carbon battery (Independent R&D)

1973.

Start producing R20C paper type zinc-carbon battery (Independent R&D)

1975.

start producing R20p paper type zinc-carbon battery  (Independent R&D and cooperate with Harbin Institute of Technology )

1976.

start producing Zn-Ag2O button cell (Independent R&D)

1978

start producing R10 paper type zinc-carbon battery

1979.

Export batteries to EU and USA through Import and Export company

1980.

start producing R14 (Japan technology) and 4R25 (Korea technology) paper type zinc-carbon battery

1986.

Start producing 3R12 battery (Independent R&D)

1987.

Import the R6P PVC production line from Vartar, Germany.   Production speed 100pcs/min

1988.

All zinc-carbon battery quality upgraded to P type quality level.

1992.

start to producing R20P metal jacket battery (Japan technology) ,

 

start to producing the Mercury free battery

1995.

Get the export and import rights from government

1996.

start to producing R14P metal jacket

1997.

start to producing R6 metal jacket

1998.

start producing LR03 and LR6 alkaline battery (Japan Fuji technology)

1999.

qualified for ISO 9001

 

 

2000.

The company become private company, change the factory name to ZHEJIANG YONGGAO BATTERY CO., LTD.

2002.

Start producing R03 metal jacket battery and R1 battery

2003.

Start producing 3LR12 battery  (Independent R&D and Korea technology)

 

start producing R03P in PVC jacket.

 

start producing LR20 battery (Independent R&D and Korea technology)

2004.

start producing 4R25-2 and 6R25

 

Imported LR03 and LR6 automatic production line from ROCKET, KOREA.  300pcs/min

2005.

start producing LR14 alkaline battery

2006.

Qualified for ROHS

2009.

The plant was established

2011.

Imported R6P, R14P, R20P metal jacket and R03 PVC high speed production from Korea.

2012.

start BSCI audit

2013.

Imported high speed LR03 and LR6 automatic production line from Korea.

 

Introduced the ULTRA ENERGY LR03 and LR6 to the market.

2014.

new automatic LR20 production line was installed, Production speed :150 pcs/min.

2017.

The upgraded Ultra Energy batteries introduced to the Market. (Perfect combination of leakage proof and discharge performance. )